| MOQ: | 2 STUKS |
| Prijs: | Bespreekbaar |
| Standaard Verpakking: | Karton |
| Levertijd: | 5 werkdagen |
| Betaalmethode: | L/C, T/T |
| Leveringscapaciteit: | 10000 pc's / jaar |
| Capacity (kg) | FEM | ISO | Height (m) | Lifting Speed (m/min) | Trolley Speed (m/min) | Lifting Motor (kw) | Trolley Motor (kw) |
|---|---|---|---|---|---|---|---|
| 3200 | 2m | M5 | 6/9/12 | 0-5 | 0-20 | 3.2 | 0.4 |
| 3200 | 2m | M5 | 6/9/12 | 0-8 | 0-20 | 4.5 | 0.4 |
| 5000 | 2m | M4 | 6/9/12/18 | 0-5 | 0-20 | 4.9 | 0.4 |
| 5000 | 2m | M4 | 6/9/12/18 | 0-8 | 0-20 | 7.5 | 0.4 |
| 10000 | 2m | M5 | 6/9/12/18 | 0-5 | 0-20 | 9 | 0.4*2 |
| 16000 | 2m | M5 | 6/9/12/18 | 0-3.5 | 0-20 | 13.5 | 0.8*2 |
| 20000 | 1Am | M4 | 6/9/12/18 | 0-3.5 | 0-20 | 13.5 | 0.8*2 |
| MOQ: | 2 STUKS |
| Prijs: | Bespreekbaar |
| Standaard Verpakking: | Karton |
| Levertijd: | 5 werkdagen |
| Betaalmethode: | L/C, T/T |
| Leveringscapaciteit: | 10000 pc's / jaar |
| Capacity (kg) | FEM | ISO | Height (m) | Lifting Speed (m/min) | Trolley Speed (m/min) | Lifting Motor (kw) | Trolley Motor (kw) |
|---|---|---|---|---|---|---|---|
| 3200 | 2m | M5 | 6/9/12 | 0-5 | 0-20 | 3.2 | 0.4 |
| 3200 | 2m | M5 | 6/9/12 | 0-8 | 0-20 | 4.5 | 0.4 |
| 5000 | 2m | M4 | 6/9/12/18 | 0-5 | 0-20 | 4.9 | 0.4 |
| 5000 | 2m | M4 | 6/9/12/18 | 0-8 | 0-20 | 7.5 | 0.4 |
| 10000 | 2m | M5 | 6/9/12/18 | 0-5 | 0-20 | 9 | 0.4*2 |
| 16000 | 2m | M5 | 6/9/12/18 | 0-3.5 | 0-20 | 13.5 | 0.8*2 |
| 20000 | 1Am | M4 | 6/9/12/18 | 0-3.5 | 0-20 | 13.5 | 0.8*2 |