| MOQ: | PCs 1 |
| Prijs: | $5000-$50000 |
| Standard Packaging: | triplexgeval |
| Delivery Period: | 10 -15 werkdagen |
| Payment Method: | L/C,T/T,Western Union,D/A,D/P |
| Supply Capacity: | 100 eenheden per maand |
| Capaciteit (kg) | FEM | ISO | Hoogte (m) | Versnelling (m/min) | De snelheid van de trolley (m/min) | H Grootte (mm) | C Grootte (mm) |
|---|---|---|---|---|---|---|---|
| 1000 | 4 m | M7 | 6/9/12 | 0.8/5.0 | 5 tot 20 | 232 | 500 |
| 1250 | 3 m | M6 | 6/9/12 | 0.8/5.0 | 5 tot 20 | 232 | 500 |
| 1600 | 3 m | M6 | 6/9/12 | 0.8/5.0 | 5 tot 20 | 232 | 500 |
| 1600 | 2 m | M5 | 6/9/12/18 | 1.6/10.0 | 5 tot 20 | 254 | 660 |
| 2000 | 2 m | M5 | 6/9/12 | 0.8/5.0 | 5 tot 20 | 232 | 500 |
| 2000 | 3 m | M6 | 6/9/12/18 | 1.6/10.0 | 5 tot 20 | 254 | 660 |
| 2500 | 3 m | M6 | 6/9/12 | 0.8/5.0 | 5 tot 20 | 232 | 500 |
| 2500 | 2 m | M5 | 6/9/12/18 | 1.6/10.0 | 5 tot 20 | 254 | 660 |
| 3200 | 2 m | M5 | 6/9/12 | 0.8/5.0 | 5 tot 20 | 232 | 500 |
| 3200 | 1 uur | M4 | 6/9/12/18 | 1.6/10.0 | 5 tot 20 | 254 | 660 |
| 5000 | 2 m | M5 | 6/9/12/18 | 0.8/5.0 | 5 tot 20 | 321 | 590 |
| 5000 | 2 m | M5 | 6/9/12/18 | 1.6/10.0 | 5 tot 20 | 254 | 790 |
| 6300 | 1 uur | M4 | 6/9/12/18 | 0.8/5.0 | 5 tot 20 | 321 | 590 |
| 8000 | 3 m | M6 | 6/9/12/18 | 0.8/5.0 | 5 tot 20 | 254 | 740 |
| 10000 | 2 m | M6 | 6/9/12/18 | 0.8/5.0 | 5 tot 20 | 321 | 740 |
| 10000 | 3 m | M4 | 6/9/12/18 | 0.6/4.0 | 5 tot 20 | 364 | 850 |
| 12500 | 1 uur | M5 | 6/9/12/18 | 0.8/5.0 | 5 tot 20 | 321 | 740 |
| 12500 | 2 m | M5 | 6/9/12/18 | 0.6/4.0 | 5 tot 20 | 404 | 850 |
| 16000 | 2 m | M4 | 6/9/12/18 | 0.6/4.0 | 5 tot 20 | 404 | 850 |
| 20000 | 1 uur | M5 | 6/9/12/18 | 0.6/4.0 | 5 tot 20 | 404 | 850 |
| MOQ: | PCs 1 |
| Prijs: | $5000-$50000 |
| Standard Packaging: | triplexgeval |
| Delivery Period: | 10 -15 werkdagen |
| Payment Method: | L/C,T/T,Western Union,D/A,D/P |
| Supply Capacity: | 100 eenheden per maand |
| Capaciteit (kg) | FEM | ISO | Hoogte (m) | Versnelling (m/min) | De snelheid van de trolley (m/min) | H Grootte (mm) | C Grootte (mm) |
|---|---|---|---|---|---|---|---|
| 1000 | 4 m | M7 | 6/9/12 | 0.8/5.0 | 5 tot 20 | 232 | 500 |
| 1250 | 3 m | M6 | 6/9/12 | 0.8/5.0 | 5 tot 20 | 232 | 500 |
| 1600 | 3 m | M6 | 6/9/12 | 0.8/5.0 | 5 tot 20 | 232 | 500 |
| 1600 | 2 m | M5 | 6/9/12/18 | 1.6/10.0 | 5 tot 20 | 254 | 660 |
| 2000 | 2 m | M5 | 6/9/12 | 0.8/5.0 | 5 tot 20 | 232 | 500 |
| 2000 | 3 m | M6 | 6/9/12/18 | 1.6/10.0 | 5 tot 20 | 254 | 660 |
| 2500 | 3 m | M6 | 6/9/12 | 0.8/5.0 | 5 tot 20 | 232 | 500 |
| 2500 | 2 m | M5 | 6/9/12/18 | 1.6/10.0 | 5 tot 20 | 254 | 660 |
| 3200 | 2 m | M5 | 6/9/12 | 0.8/5.0 | 5 tot 20 | 232 | 500 |
| 3200 | 1 uur | M4 | 6/9/12/18 | 1.6/10.0 | 5 tot 20 | 254 | 660 |
| 5000 | 2 m | M5 | 6/9/12/18 | 0.8/5.0 | 5 tot 20 | 321 | 590 |
| 5000 | 2 m | M5 | 6/9/12/18 | 1.6/10.0 | 5 tot 20 | 254 | 790 |
| 6300 | 1 uur | M4 | 6/9/12/18 | 0.8/5.0 | 5 tot 20 | 321 | 590 |
| 8000 | 3 m | M6 | 6/9/12/18 | 0.8/5.0 | 5 tot 20 | 254 | 740 |
| 10000 | 2 m | M6 | 6/9/12/18 | 0.8/5.0 | 5 tot 20 | 321 | 740 |
| 10000 | 3 m | M4 | 6/9/12/18 | 0.6/4.0 | 5 tot 20 | 364 | 850 |
| 12500 | 1 uur | M5 | 6/9/12/18 | 0.8/5.0 | 5 tot 20 | 321 | 740 |
| 12500 | 2 m | M5 | 6/9/12/18 | 0.6/4.0 | 5 tot 20 | 404 | 850 |
| 16000 | 2 m | M4 | 6/9/12/18 | 0.6/4.0 | 5 tot 20 | 404 | 850 |
| 20000 | 1 uur | M5 | 6/9/12/18 | 0.6/4.0 | 5 tot 20 | 404 | 850 |