| MOQ: | 1 set |
| Prijs: | Bespreekbaar |
| Standard Packaging: | Standaard de uitvoergevallen |
| Delivery Period: | 15 tot 20 werkdagen |
| Payment Method: | L/C, T/T, Western Union |
| Supply Capacity: | 300 sets per maand |
| Capaciteit (ton) | Lifthoogte (m) | Liftsnelheid (m/min) | Liftmotor (kw) | Verplaatsingssnelheid (m/min) | Vervoermotor (kw) | Liftsystem FEM/ISO | Reissysteem FEM/ISO | Vervaardiging van elektrische voertuigen |
|---|---|---|---|---|---|---|---|---|
| 3.2t | 6/9/12/15/18 | 5/0.8 | 3.2/0.42 | 5/20 | 0.25x2 | 2M | M5 | 1000-1700 |
| 5t | 6/9/12/15/18 | 5/0.8 | 6.1/1 | 5/20 | 0.37x2 | 2M | M5 | 1000-1700 |
| 6.3t | 6/9/12/15/18 | 5/0.8 | 6.1/1 | 5/20 | 0.37x2 | 2M | M5 | 1000-1700 |
| 8t | 6/9/12/15/18 | 5/0.8 | 9.5/1.5 | 5/20 | 0.37x2 | 2M | M5 | 1000 tot 2000 |
| 10 t | 6/9/12/15/18 | 5/0.8 | 9.5/1.5 | 5/20 | 0.37x2 | 2M | M5 | 1000 tot 2000 |
| 12.5t | 6/9/12/15/18 | 5/0.8 | 12.5/2 | 5/20 | 0.55x2 | Een uur. | M4 | 1000 tot 2000 |
| 16 t | 6/9/12/15/18 | 4/0.6 | 16/2.6 | 5/20 | 0.55x2 | 2M | M5 | 1400-2400 |
| 20 t | 6/9/12/15/18 | 4/0.6 | 16/2.6 | 5/20 | 0.55x2 | 1 uur | M4 | 1400-2400 |
| 25 t | 6/9/12/15/18 | 3.3/0.8 | 20/5 | 5/20 | 0.75x2 | 3M | M6 | 1700 tot en met 3100 |
| 32 t | 6/9/12/15/18 | 3.3/0.8 | 20/5 | 1.1x2 | 2M | M5 | 1700 tot en met 3100 | |
| 40 t | 6/9/12/15/18 | 0-4 | 38 | 5/20 | 1.5x2 | 1 uur | M4 | 1700 tot en met 3100 |
| 50 ton | 6/9/12/15/18 | 0-3. | 38 | 5/20 | 1.5x2 | 2M | M5 | 1700 tot en met 3100 |
| 50 ton | 6/9/12/15/18 | 0-3. | 38 | 5/20 | 1.5x2 | 2M | M5 | 2000-4200 |
| MOQ: | 1 set |
| Prijs: | Bespreekbaar |
| Standard Packaging: | Standaard de uitvoergevallen |
| Delivery Period: | 15 tot 20 werkdagen |
| Payment Method: | L/C, T/T, Western Union |
| Supply Capacity: | 300 sets per maand |
| Capaciteit (ton) | Lifthoogte (m) | Liftsnelheid (m/min) | Liftmotor (kw) | Verplaatsingssnelheid (m/min) | Vervoermotor (kw) | Liftsystem FEM/ISO | Reissysteem FEM/ISO | Vervaardiging van elektrische voertuigen |
|---|---|---|---|---|---|---|---|---|
| 3.2t | 6/9/12/15/18 | 5/0.8 | 3.2/0.42 | 5/20 | 0.25x2 | 2M | M5 | 1000-1700 |
| 5t | 6/9/12/15/18 | 5/0.8 | 6.1/1 | 5/20 | 0.37x2 | 2M | M5 | 1000-1700 |
| 6.3t | 6/9/12/15/18 | 5/0.8 | 6.1/1 | 5/20 | 0.37x2 | 2M | M5 | 1000-1700 |
| 8t | 6/9/12/15/18 | 5/0.8 | 9.5/1.5 | 5/20 | 0.37x2 | 2M | M5 | 1000 tot 2000 |
| 10 t | 6/9/12/15/18 | 5/0.8 | 9.5/1.5 | 5/20 | 0.37x2 | 2M | M5 | 1000 tot 2000 |
| 12.5t | 6/9/12/15/18 | 5/0.8 | 12.5/2 | 5/20 | 0.55x2 | Een uur. | M4 | 1000 tot 2000 |
| 16 t | 6/9/12/15/18 | 4/0.6 | 16/2.6 | 5/20 | 0.55x2 | 2M | M5 | 1400-2400 |
| 20 t | 6/9/12/15/18 | 4/0.6 | 16/2.6 | 5/20 | 0.55x2 | 1 uur | M4 | 1400-2400 |
| 25 t | 6/9/12/15/18 | 3.3/0.8 | 20/5 | 5/20 | 0.75x2 | 3M | M6 | 1700 tot en met 3100 |
| 32 t | 6/9/12/15/18 | 3.3/0.8 | 20/5 | 1.1x2 | 2M | M5 | 1700 tot en met 3100 | |
| 40 t | 6/9/12/15/18 | 0-4 | 38 | 5/20 | 1.5x2 | 1 uur | M4 | 1700 tot en met 3100 |
| 50 ton | 6/9/12/15/18 | 0-3. | 38 | 5/20 | 1.5x2 | 2M | M5 | 1700 tot en met 3100 |
| 50 ton | 6/9/12/15/18 | 0-3. | 38 | 5/20 | 1.5x2 | 2M | M5 | 2000-4200 |